School district · Guadalupe County

Schertz-Cibolo-U City ISD bond elections

School district · Listed by the Texas Bond Review Board under Guadalupe County

From Texas Bond Review Board data as of November 6, 2026, last updated by the Board on November 6, 2026. Covers elections through May 2, 2026. November 2026 results will be added once local officials certify them.

The election record

On May 2, 2026, Schertz-Cibolo-U City ISD had 3 bond propositions on the ballot, $295.1 million in total, as reported to the Texas Bond Review Board: 3 passed.

Schertz-Cibolo-U City ISD, which the Texas Bond Review Board lists under Guadalupe County, has 4 bond propositions reported to the Board since January 1, 2016: 4 passed.

Figures last changed November 6, 2026.

Cite this page: Schertz-Cibolo-U City ISD bond elections, Texas local bond elections, https://yesintexas.com/bonds/schertz-cibolo-u-city-isd, figures as of November 6, 2026, as reported to the Texas Bond Review Board.

What this record does not show: turnout, why people voted as they did, tax-rate elections, campaign spending, or elections not reported to the Texas Bond Review Board. Methodology

Key figures since 2016

Propositions
4
Passed
4
Failed
0
Amount passed
$432.1 million
Amount failed
$0
Closest result
756 votes (19.9 pts), May 2, 2026, Prop B
Most recent election
, 3 passed

Election history

Schertz-Cibolo-U City ISD bond propositions since January 1, 2016, as reported to the Texas Bond Review Board
PropositionResultFor (districtwide)Against (districtwide)Share forMargin (votes)Margin (points)AmountPurpose as reportedNotesData levelReport an error
, Prop ALinked resultPassed2,5641,24167.4%1,32334.8$230.7M“School Building”As reported to the Texas Bond Review Board
Source and citation

Schertz-Cibolo-U City ISD, Prop A, May 2, 2026, Texas local bond elections, https://yesintexas.com/bonds/schertz-cibolo-u-city-isd#2026-05-02-prop-a, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record schertz-cibolo-u-city-isd/2026-05-02/a).

Report
, Prop BLinked resultPassed2,2791,52359.9%75619.9$55.3M“Stadium”As reported to the Texas Bond Review Board
Source and citation

Schertz-Cibolo-U City ISD, Prop B, May 2, 2026, Texas local bond elections, https://yesintexas.com/bonds/schertz-cibolo-u-city-isd#2026-05-02-prop-b, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record schertz-cibolo-u-city-isd/2026-05-02/b).

Report
, Prop CLinked resultPassed2,6131,18568.8%1,42837.6$9.1M“Technology”As reported to the Texas Bond Review Board
Source and citation

Schertz-Cibolo-U City ISD, Prop C, May 2, 2026, Texas local bond elections, https://yesintexas.com/bonds/schertz-cibolo-u-city-isd#2026-05-02-prop-c, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record schertz-cibolo-u-city-isd/2026-05-02/c).

Report
, Prop 1Linked resultPassed18,5535,67376.6%12,88053.2$137.0M“School Building”As reported to the Texas Bond Review Board
Source and citation

Schertz-Cibolo-U City ISD, Prop 1, November 8, 2016, Texas local bond elections, https://yesintexas.com/bonds/schertz-cibolo-u-city-isd#2016-11-08-prop-1, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record schertz-cibolo-u-city-isd/2016-11-08/1).

Report

Scroll sideways.

Earlier records (before 2016)
Schertz-Cibolo-U City ISD bond propositions before 2016, as reported to the Texas Bond Review Board
PropositionResultFor (districtwide)Against (districtwide)Share forMargin (votes)Margin (points)AmountPurpose as reportedNotesData levelReport an error
, Prop 1Linked resultPassed68647759.0%20918.0$92.0M“School Building”As reported to the Texas Bond Review BoardReport
, Prop 1Linked resultPassed$155.6M“Building”The reported counts (1 for, 0 against) are placeholders, not vote totalsAs reported to the Texas Bond Review BoardReport
, Prop 2Linked resultPassed$51.6M“Building & Renovations”The reported counts (1 for, 0 against) are placeholders, not vote totalsAs reported to the Texas Bond Review BoardReport
, Prop 3Linked resultFailed$10.1M“Athletic Facilities”The reported counts (0 for, 1 against) are placeholders, not vote totalsAs reported to the Texas Bond Review BoardReport
, Prop 1Linked resultPassed$57.3M“Building”The reported counts (1 for, 0 against) are placeholders, not vote totalsAs reported to the Texas Bond Review BoardReport
, Prop 2Linked resultPassed$11.1M“Renovations”The reported counts (1 for, 0 against) are placeholders, not vote totalsAs reported to the Texas Bond Review BoardReport
, Prop 3Linked resultPassed$4.1M“Other”The reported counts (1 for, 0 against) are placeholders, not vote totalsAs reported to the Texas Bond Review BoardReport
, Prop 4Linked resultPassed$3.5M“Other”The reported counts (1 for, 0 against) are placeholders, not vote totalsAs reported to the Texas Bond Review BoardReport
, Prop 5Linked resultPassed$1.0M“Other”The reported counts (1 for, 0 against) are placeholders, not vote totalsAs reported to the Texas Bond Review BoardReport

Scroll sideways.

Amount is the principal authorized on the ballot, not the total cost.

Debt context, fiscal year 2025

Total tax rate
$1.1369 per $100 of taxable value
Taxable value
$7.9 billion
Tax-backed principal outstanding
$324.7 million
Tax-backed total debt service outstanding
$507.4 million
Tax-backed debt per student in average daily attendance
$23,641
Average daily attendance
13,733
Change in average daily attendance over five years
−8.8% (−1,329)

Matched to BRB debt data by name, type and county.

Source: Texas Bond Review Board, Debt Outstanding By Issuance Local By Year (3qmf-seku), retrieved November 4, 2026.

Next election date

Next uniform election date: Sat May 1, 2027. For most local elections the order deadline is Fri Feb 12, 2027 (Election Code §3.005). Calendar

Running a campaign on a local measure?

Campaign pages are paid for by the committee that sponsors them. They are separate from this record, and no sponsor can change it.