School district · Nueces County
Port Aransas ISD bond elections
School district · Listed by the Texas Bond Review Board under Nueces County
From Texas Bond Review Board data as of November 6, 2026, last updated by the Board on November 6, 2026. Covers elections through May 2, 2026. November 2026 results will be added once local officials certify them.
The election record
On May 2, 2026, Port Aransas ISD had 3 bond propositions on the ballot, $8.2 million in total, as reported to the Texas Bond Review Board: 3 passed.
Port Aransas ISD, which the Texas Bond Review Board lists under Nueces County, has 12 bond propositions reported to the Board since January 1, 2016: 12 passed.
Figures last changed November 6, 2026.
Cite this page: Port Aransas ISD bond elections, Texas local bond elections, https://yesintexas.com/bonds/port-aransas-isd, figures as of November 6, 2026, as reported to the Texas Bond Review Board.
What this record does not show: turnout, why people voted as they did, tax-rate elections, campaign spending, or elections not reported to the Texas Bond Review Board. Methodology
Closest results since 2016
Passed by 60 votes
$360,000 bond
Port Aransas ISD, November 3, 2020, Prop 3
1,140 for, 1,080 against · 51.4% for
No Port Aransas ISD proposition failed in a close vote since 2016, as reported to the Texas Bond Review Board.
The smallest margin among close votes that passed, and among those that failed: decided by fewer than 100 votes, with the winning side under 52% of the votes cast, as reported to the Texas Bond Review Board. Amounts are the principal on the ballot, before interest. Ties are left out.
Key figures since 2016
- Propositions
- 12
- Passed
- 12
- Failed
- 0
- Amount passed
- $57.1 million
- Amount failed
- $0
- Closest result
- 60 votes (2.7 pts), Nov 3, 2020, Prop 3
Election history
| Proposition | Result | For (districtwide) | Against (districtwide) | Share for | Margin (votes) | Margin (points) | Amount | Purpose as reported | Notes | Data level | Report an error |
|---|---|---|---|---|---|---|---|---|---|---|---|
| , Prop ALinked result | Passed | 252 | 46 | 84.6% | 206 | 69.1 | $4.2M | “School Building” | As reported to the Texas Bond Review BoardSource and citationPort Aransas ISD, Prop A, May 2, 2026, Texas local bond elections, https://yesintexas.com/bonds/port-aransas-isd#2026-05-02-prop-a, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record port-aransas-isd/2026-05-02/a). | Report | |
| , Prop BLinked result | Passed | 250 | 48 | 83.9% | 202 | 67.8 | $2.9M | “Athletic Facilities” | As reported to the Texas Bond Review BoardSource and citationPort Aransas ISD, Prop B, May 2, 2026, Texas local bond elections, https://yesintexas.com/bonds/port-aransas-isd#2026-05-02-prop-b, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record port-aransas-isd/2026-05-02/b). | Report | |
| , Prop CLinked result | Passed | 252 | 45 | 84.8% | 207 | 69.7 | $1.2M | “Technology” | As reported to the Texas Bond Review BoardSource and citationPort Aransas ISD, Prop C, May 2, 2026, Texas local bond elections, https://yesintexas.com/bonds/port-aransas-isd#2026-05-02-prop-c, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record port-aransas-isd/2026-05-02/c). | Report | |
| , Prop 1Linked result | Passed | 750 | 260 | 74.3% | 490 | 48.5 | $19.6M | “School Building” | As reported to the Texas Bond Review BoardSource and citationPort Aransas ISD, Prop 1, May 6, 2023, Texas local bond elections, https://yesintexas.com/bonds/port-aransas-isd#2023-05-06-prop-1, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record port-aransas-isd/2023-05-06/1). | Report | |
| , Prop 2Linked result | Passed | 731 | 277 | 72.5% | 454 | 45.0 | $16.0M | “Fine Arts Venue” | As reported to the Texas Bond Review BoardSource and citationPort Aransas ISD, Prop 2, May 6, 2023, Texas local bond elections, https://yesintexas.com/bonds/port-aransas-isd#2023-05-06-prop-2, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record port-aransas-isd/2023-05-06/2). | Report | |
| , Prop 3Linked result | Passed | 745 | 265 | 73.8% | 480 | 47.5 | $300,000 | “Technology” | As reported to the Texas Bond Review BoardSource and citationPort Aransas ISD, Prop 3, May 6, 2023, Texas local bond elections, https://yesintexas.com/bonds/port-aransas-isd#2023-05-06-prop-3, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record port-aransas-isd/2023-05-06/3). | Report | |
| , Prop 4Linked result | Passed | 709 | 301 | 70.2% | 408 | 40.4 | $2.0M | “Athletic Facilities Improvements” | As reported to the Texas Bond Review BoardSource and citationPort Aransas ISD, Prop 4, May 6, 2023, Texas local bond elections, https://yesintexas.com/bonds/port-aransas-isd#2023-05-06-prop-4, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record port-aransas-isd/2023-05-06/4). | Report | |
| , Prop 1Linked result | Passed | 1,242 | 991 | 55.6% | 251 | 11.2 | $4.2M | “School Building” | As reported to the Texas Bond Review BoardSource and citationPort Aransas ISD, Prop 1, November 3, 2020, Texas local bond elections, https://yesintexas.com/bonds/port-aransas-isd#2020-11-03-prop-1, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record port-aransas-isd/2020-11-03/1). | Report | |
| , Prop 2Linked result | Passed | 1,301 | 921 | 58.6% | 380 | 17.1 | $241,000 | “Athletic Facilities Improvements” | As reported to the Texas Bond Review BoardSource and citationPort Aransas ISD, Prop 2, November 3, 2020, Texas local bond elections, https://yesintexas.com/bonds/port-aransas-isd#2020-11-03-prop-2, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record port-aransas-isd/2020-11-03/2). | Report | |
| , Prop 3Linked result | Passed | 1,140 | 1,080 | 51.4% | 60 | 2.7 | $360,000 | “Housing Facility” | As reported to the Texas Bond Review BoardSource and citationPort Aransas ISD, Prop 3, November 3, 2020, Texas local bond elections, https://yesintexas.com/bonds/port-aransas-isd#2020-11-03-prop-3, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record port-aransas-isd/2020-11-03/3). | Report | |
| , Prop 4Linked result | Passed | 1,366 | 834 | 62.1% | 532 | 24.2 | $175,000 | “Technology” | As reported to the Texas Bond Review BoardSource and citationPort Aransas ISD, Prop 4, November 3, 2020, Texas local bond elections, https://yesintexas.com/bonds/port-aransas-isd#2020-11-03-prop-4, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record port-aransas-isd/2020-11-03/4). | Report | |
| , Prop 1Linked result | Passed | 308 | 55 | 84.8% | 253 | 69.7 | $6.0M | “School Building” | As reported to the Texas Bond Review BoardSource and citationPort Aransas ISD, Prop 1, May 6, 2017, Texas local bond elections, https://yesintexas.com/bonds/port-aransas-isd#2017-05-06-prop-1, figures as of November 6, 2026, as reported to the Texas Bond Review Board (record port-aransas-isd/2017-05-06/1). | Report |
Scroll sideways.
Earlier records (before 2016)
| Proposition | Result | For (districtwide) | Against (districtwide) | Share for | Margin (votes) | Margin (points) | Amount | Purpose as reported | Notes | Data level | Report an error |
|---|---|---|---|---|---|---|---|---|---|---|---|
| , Prop 1Linked result | Passed | 865 | 401 | 68.3% | 464 | 36.7 | $200,000 | “Vehicles” | As reported to the Texas Bond Review Board | Report | |
| , Prop 1Linked result | Passed | 309 | 207 | 59.9% | 102 | 19.8 | $7.1M | “School Building” | As reported to the Texas Bond Review Board | Report | |
| , Prop 2Linked result | Failed | 240 | 264 | 47.6% | 24 | 4.8 | $2.9M | “Auditorium” | As reported to the Texas Bond Review Board | Report | |
| , Prop 1Linked result | Passed | 203 | 47 | 81.2% | 156 | 62.4 | $1.1M | “School Building” | As reported to the Texas Bond Review Board | Report |
Scroll sideways.
Amount is the principal authorized on the ballot, not the total cost.
Debt context, fiscal year 2025
- Total tax rate
- $0.7389 per $100 of taxable value
- Taxable value
- $6.4 billion
- Tax-backed principal outstanding
- $33.2 million
- Tax-backed total debt service outstanding
- $47.2 million
- Tax-backed debt per student in average daily attendance
- $61,720
- Average daily attendance
- 538
- Change in average daily attendance over five years
- +14.5% (+68)
Matched to BRB debt data by name, type and county.
Source: Texas Bond Review Board, Debt Outstanding By Issuance Local By Year (3qmf-seku), retrieved November 4, 2026.
Next election date
Next uniform election date: Sat May 1, 2027. For most local elections the order deadline is Fri Feb 12, 2027 (Election Code §3.005). Calendar
Running a campaign on a local measure?
Campaign pages are paid for by the committee that sponsors them. They are separate from this record, and no sponsor can change it.